Bathroom renovation in Cyprus: steps, timeline and cost factors
A new bathroom should look good and stay watertight for years. Here is how a renovation should be done, step by step.
6 min read · Last updated 2026-11-16
The steps, in the right order
Survey, measurements and choice of layout, tiles and fittings
Strip-out of old tiles, sanitaryware and screed
New water pipes, drains, electrical points and extractor fan
Levelling walls and floor
Waterproofing of the shower area and floor, with a leak test
Tiling, then sanitaryware, glass and lighting
Silicone, cleaning and handover
How long it takes
A typical full bathroom takes about two to three weeks, depending on size, finishes and delivery times. A refresh without moving plumbing can be much quicker. We give you a day-by-day schedule in the quote.
What affects the cost
Every bathroom is different, so we quote after a visit. The main factors are:
Size of the room and amount of tiling
Moving the WC, shower or drains to new positions
Choice of tiles, sanitaryware and glass
Walk-in shower with linear drain versus a shower tray
inonda2026@outlook.comBased in Strovolos, Nicosia · working across CyprusWe reply the same working day
INONDA LTD · THREE CONNECTED WEBSITES
One team. Your next step.
All three websites belong to INONDA LTD. Find the service you need, explore a planning budget, then call us to arrange an inspection and written offer.
inonda.site
Manage my property
Rental care, owner support, inspections and ongoing property management across Cyprus.
The estimator is a planning tool, not a fixed quote. Specialist trades, fixtures and structural work require a separate assessment. Your saved estimates stay in your browser on inonda.homes.
Book an inspection
Tell us what work you need and where the property is located. We review the requirements, arrange an inspection where appropriate and provide a written offer.